| |
|
|
| |
Relcon Castle - Specifications
|
| |
| Flooring
: |
Vitrified
tiles for the entire floor. |
| Doors
& windows : |
Quality
Teak wood front door. Attractive Internal
panel doors. Wooden windows including
grills and fully glazed shutters.
|
| Kitchen
: |
Kitchen
counter with granite top and stainless
steel sink. Ceramic tiles above the counter
to a height of 45cm, ample storage space. |
| Toilet
: |
Flooring
& dadoing to a height of 210cm with
designer ceramic tiles. Concealed piping,
light colored sanitary fixtures and C.P.
fittings. Hot and Cold mix tap with shower.
Provision for geyser connection. |
| Painting
: |
Acrylic
coating for front exterior wall. Emulsion
with putty finish for inside walls. Enamel
paint for doors and windows. |
| Electrical
: |
Independent
electrical connection including ELCB &
MCB, 2 light points and one fan point
in each room. Exhaust fan provision in
kitchen and toilets. Switches - Modular
Type. |
| Telephone
line : |
Concealed
conduits for telephone to drawing and
master bedroom. |
| Water
Supply : |
Round
the clock water supply through sump and
overhead tank. |
| Security
: |
24
hours security arrangements (on completion
by the association) |
| Air
Conditioning : |
Provision
for air conditioning in master bedroom.
(split unit) |
|
| |
MAINTENANCE
The initial six months period after completion
of the project will be treated as the defect liability
period. During this period Relcon will take care
of maintaining “Relcon Castle”,
in its pristine form at the cost of the owners. |
| |
Relcon Castle - Terms & Conditions  |
| |
1)
On registration and booking, Sales and Construction
Agreement shall be executed between the Promoter
and the Owner (Applicant).
2) The concept of the transaction shall be sale
of undivided share of land, on the condition that
Promoter only shall be undertaking the construction
utilising the funds to be made available by the
Owner through advances. (or as per latest tax
rules of the Kerala Govt.)
3) On completion of the construction Promoter
shall arrange legal transfer of the property /
land share in favour of the owner at the cost
of the latter which shall be subject to the owner
paying all the outstanding dues to the Promoter.
4) The measurements / specifications given in
the Brochure shall be subject to variations of
minor nature, if such changes are warranted due
to statutory or commercial requirements which
shall not be objected to by the owner.
5) Residential / Commercial Apartment buildings
are constructed by the Promoters and handed over
to the Owners on fulfilling the agreement obligations
by the parties concerned. The maintenance responsibility
of the Building shall rest with Society / Association
of the Owners which shall be formed in conformity
with the Kerala Apartment Ownership Act 1983.
6) Besides, the payment of the construction cost
in the manner incorporated in relevant schedule
in the agreement, the Owner has to bear the following
expenditure:
a) Electrical / Water connection deposits / charges,
expenses towards electrical transformer / generator
Power cabling, RMU, KSEB deposit against energy
metre installation and any other statutory fees.
b) 4% of the value towards the Works Contract
Tax related to the construction plus surcharge
(VAT).
c) 1% of the value towards the contribution to
the Kerala State Construction workers welfare
fund.
d) Service Tax as per the prevailing rules, which
is about 4% + surcharges.
e) Building Tax, Corporation Tax, any other taxes
/ levies existing or likely to be paid on account
of the construction of the apartment allotted.
7) Once booked and confirmed, Owner is not normally
expected to cancel. In the event of cancellation,
the amounts advanced by him shall be refunded
without any interest; but only on the Promoter
finding an alternative buyer.
|
| |
Call
us at :
Mob : 98470 30938 / 99470 30937
Telefax : 0471 - 2557941 |
| |
|
|